Integrations/GIS & mapping
shippedGeospatial

GIS & mapping

Ground sensors, satellite imagery, drone surveys, and elevation models aligned in one coordinate frame.

What it is

Distributed assets are a map problem before they are a dashboard problem. InfiIoT layers live device data onto Google Maps, ingests satellite imagery pipelines (NDVI/EVI for crop intelligence), processes drone photogrammetry and DEMs for mines and infrastructure, and renders full 3D scenes on a Cesium.js + WebGL stack.

Google Maps layersNDVI / EVI pipelinesdrone photogrammetryDEM processingCesium.js / WebGL
GIS & mapping
How it works

The data path, including the hand-offs that usually cause trouble.

01

Geo-reference

Every device carries coordinates; fleets render as live layers on Google Maps with status at a glance.

02

Layer imagery

Satellite NDVI/EVI passes and weekly drone orthomosaics are ingested and aligned to the same coordinate frame.

03

Fuse

Remote sensing meets ground truth: soil probes validate satellite indices, strain gauges anchor structural models.

04

Render

The same geo-referenced data can render as a 2D operating map or a detailed 3D Cesium scene, depending on the task.

Top use cases

Where teams use this integration.

For the mine operations director

Repeatable compliance evidence

Weekly drone twins and volumetrics produce the 3D models and reports required for DGMS reviews with less manual preparation.

For the agri business head

Irrigation based on field evidence

Satellite NDVI, checked against ground soil probes, helps identify which plots need water and which do not.

For the infrastructure asset owner

Distributed assets on one map

Pump houses, feeders, tanks, and meters appear as live layers so the morning review does not start with a round of status calls.

Want this wired into your stack?

Bring the source system, target system, and security constraints. An engineer will map the interface and the unresolved questions.

Connected-product assessment

Bring one product. Leave with a clear next step.

Use 30 minutes to test the fit around one product and one blocked decision. If there is a fit, we will outline the two-week Product Blueprint.

30-minute fit callOne productNo prepared deck